Request an Equipment or Plant Quote
Equipment Plant Quote
This page exists to make your enquiry productive. Plant and equipment quotations from Klean Commodities are issued direct from the manufacturer, and the quality of the offer you receive depends almost entirely on the quality of the information in the request. Below is the data set our engineers work from.
Send these eight inputs
- Feedstock — type, source, and an analysis if you have one.
- Volume — tonnes per day or per annum, and the operating hours assumed.
- Product slate — which outputs you intend to sell and at what grade.
- Site — country, location, available footprint and existing buildings.
- Utilities — power, water, gas and effluent provisions.
- Permitting — the regulatory regime and emissions limits you must satisfy.
- Timeline — target financial close and commissioning dates.
- Scope preference — equipment only, process island, or turn-key delivery.
What the quotation covers
A scoped quotation sets out the equipment list, the battery limits, what is included and — equally important — what is excluded, together with indicative delivery lead times and the engineering support available. Exclusions deserve attention: civil works, buildings, local utilities connection and permitting costs are frequently assumed by buyers and frequently sit outside an equipment scope.
What happens next
Most projects move from quotation into a feasibility study, because lenders and boards need a business case before capital is committed. From there the route runs through design and engineering into turn-key EPC (DBC) delivery, with due diligence support where investors require independent verification. You can enter that chain at any point.
Timeline expectations
Straightforward equipment enquiries are answered quickly. Complete plant scopes take longer because the configuration has to be engineered before it can be priced honestly. A supplier who returns a full plant price within a day has not read your feedstock analysis.
Comparing competing quotations
When you hold several offers, normalise them before you judge them. Put every vendor's battery limits, exclusions, performance guarantees, spares package, commissioning support and payment terms into one table. Differences that look like price are usually differences in scope, and a plant that arrives without a commissioning package or a spares holding costs far more in its first operating year than the saving on the purchase order.
Confidentiality
Technical data supplied with your enquiry is treated as confidential, and a mutual non-disclosure agreement can be put in place before detailed information is exchanged if your project requires it.
Send the data, get a scoped plant quotation
Equipment lists, battery limits, exclusions and lead times — quoted direct from the manufacturer against your feedstock, throughput and site.
Klean Industries delivers feasibility studies, design and engineering, and turn-key EPC (DBC) projects, with a completed portfolio spanning tire pyrolysis, rCB, plastic pyrolysis and waste-to-energy.
Do you have a feedstock analysis to send with the enquiry?